Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'Hypoluxo Rd. ' (1) ·
'Hypoluxo Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAKE OSBOURNE ' (1) ·
'Lantana Road ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-401 ' (1) ·
'Sykes Creek ' (1) ·
'US-1 & FECRR ' (1) ·
George King Blvd (1) ·
SR-401 (1)
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'Hypoluxo Rd ' (1) ·
'Hypoluxo to SB I95' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'Lantana to I 95 SB' (1) ·
'SB I 95 to Lantana' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
Overpass Ramp (1) ·
SR-A1A SB (1)
700014 (1) ·
700025 (1) ·
700028 (1) ·
700030 (1) ·
700031 (1) ·
700074 (1) ·
700112 (1) ·
700115 (1) ·
700117 (1) ·
700140 (1) ·
700210 (1) ·
700218 (1) ·
930274 (1) ·
930275 (1) ·
930276 (1) ·
930298 (1) ·
930299 (1) ·
930307 (1) ·
931002 (1) ·
931003 (1) ·
934331 (1) ·
934332 (1) ·
934341 (1) ·
934342 (1) ·
934369 (1)
'0.3 Mile East of US-1 ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.7MI W OF SR-401 ' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-528 EB - SR-401 ' (1) ·
'SR-528 EB - Sykes Creek ' (1) ·
'SR-528 WB - SR-401 ' (1) ·
'SR-528 WB - Sykes Creek ' (1) ·
'SR-528 WB - US-1 & FECRR ' (1) ·
0.7 Mile N of SR-528 (1) ·
SR-A1A SB- George King (1)
26341790 (1) ·
26342000 (1) ·
26342200 (1) ·
26344631 (1) ·
26344632 (1) ·
26350300 (1) ·
26351210 (1) ·
26351400 (1) ·
26351510 (1) ·
26351567 (1) ·
26351625 (1) ·
26352544 (1) ·
26352545 (1) ·
28240145 (1) ·
28241290 (1) ·
28241828 (1) ·
28241875 (1) ·
28241892 (1) ·
28241926 (1) ·
28241941 (1) ·
28241991 (1) ·
28243313 (1) ·
28243314 (1) ·
28243318 (1) ·
28250000 (1)
80024400 (1) ·
80040850 (1) ·
80041000 (1) ·
80041025 (1) ·
80041140 (1) ·
80041145 (1) ·
80044182 (1) ·
80044190 (1) ·
80052259 (1) ·
80052320 (1) ·
80102377 (1) ·
80102433 (1) ·
80370748 (1) ·
80375518 (1) ·
80375564 (1) ·
80375566 (1) ·
80375599 (1) ·
80375608 (1) ·
80375690 (1) ·
80384625 (1) ·
80384626 (1) ·
80413925 (1) ·
80413927 (1) ·
80451074 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)