Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930003 (1) ·
930050 (1) ·
930163 (1) ·
930195 (1) ·
930361 (1) ·
934116 (1) ·
934164 (1) ·
934313 (1) ·
935001 (1) ·
935002 (1) ·
936550 (1)
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'A1A on Singer Island ' (1) ·
'Just North of SR-850 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)