Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'E-1 CANAL ' (1) ·
'JOANN CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'Lateral H Canal ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'RANGE LINE CANAL ' (1) ·
'SALERNO CREEK ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Tributary to Spruce Crk ' (1)
'53rd Street ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD WB ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'PALMETTO PARK RD. ' (1) ·
'SW 15TH AVE ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'Tomoka Farms Rd ' (1) ·
'VIA DELRAY BLVD ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
794007 (1) ·
880047 (1) ·
884027 (1) ·
884028 (1) ·
884038 (1) ·
884083 (1) ·
894041 (1) ·
894049 (1) ·
934427 (1) ·
934461 (1) ·
934468 (1) ·
934469 (1) ·
934922 (1) ·
934923 (1) ·
934924 (1) ·
934968 (1) ·
934969 (1)
'0.2MI W OF I-95 ' (1) ·
'0.5MI W OF MILITARY TRAIL' (1) ·
'0.6 mi North of Taylor Rd' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'3MI W OF CR-615 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'PALMETTO PK RD US-441 SR7' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)