Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'C-18 Canal ' (1) ·
'FELLSMERE CANAL ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'I-95 ' (1) ·
'Lake Worth Lagoon ' (1) ·
'MANATEE POCKET ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'SR 70 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1)
'COUNTY RD 507 ' (1) ·
'Emerson Drive ' (1) ·
'HORSESHOE POINT RD' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Pineda Causeway ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR A1A ' (1) ·
'SR91 NB TPK 153.1 ' (1)
700225 (1) ·
705906 (1) ·
880076 (1) ·
890101 (1) ·
930184 (1) ·
930371 (1) ·
930372 (1) ·
930445 (1) ·
930530 (1) ·
930531 (1) ·
930547 (1) ·
934179 (1) ·
940085 (1) ·
940134 (1) ·
940135 (1)
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.25 Mile N of Center St.' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'1 mile North of SR 704 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'4.2MI N OF CR-512 ' (1) ·
'I 95 SR706 interchange ' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)