Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR708 125.4 ' (1) ·
'Haverhill Rd ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR 807 ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR 807 ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SW 18TH ST ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-17 ' (1) ·
'US-192 WB ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1)
700023 (1) ·
700058 (1) ·
700079 (1) ·
700089 (1) ·
700132 (1) ·
700153 (1) ·
790002 (1) ·
790021 (1) ·
790086 (1) ·
790097 (1) ·
790149 (1) ·
790217 (1) ·
890119 (1) ·
930476 (1) ·
930533 (1) ·
934295 (1) ·
935218 (1) ·
940126 (1) ·
940127 (1)
'0.1 MILE WEST OF I-95 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'I-95 NB over SR-50 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-404 WB over CR-3 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
'US-1 SB - Turnbull Creek ' (1) ·
'US-17 over Deep Creek ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'US-92 EB -Tomoka River ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)