Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'4th St. and Canal D ' (1) ·
'Belvedere Road ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'Burns Road ' (1) ·
'C-15 CANAL ' (1) ·
'C-17 Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'CSX Railroad ' (1) ·
'CSX RR ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'Jupiter Creek ' (1) ·
'L-14 CANAL ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'LAKEWOOD E4 CANAL ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-40 ' (1) ·
'SR-514 ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Summit Boulevard ' (1) ·
'SW 10th St. Lowson Blvd ' (1) ·
'Sykes Creek ' (1) ·
'Thompson River ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'10th Ave North ' (1) ·
'BELVEDERE ROAD ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-516 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Hypoluxo Rd ' (1) ·
'HYPOLUXO RD. ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 ' (1) ·
'Indiantown Rd. ' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD ' (1) ·
'Linton Blvd. ' (1) ·
'LPGA Blvd ' (1) ·
'MARINA BLVD. ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Peninsula Corp Dr ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR 710 ' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR-520 ' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'SW 15TH AVE ' (1) ·
'W. CAMINO REAL ' (1)
Number 008:
Location 009:
Latitude 016:
Longitude 017:
1956 (1) ·
1960 (1) ·
1966 (1) ·
1967 (1) ·
1969 (1) ·
1971 (1) ·
1972 (1) ·
1974 (1) ·
1975 (1) ·
1976 (1) ·
1982 (1) ·
1987 (1) ·
1988 (1) ·
1989 (1) ·
1990 (1) ·
1991 (1) ·
1992 (1) ·
1993 (1) ·
1994 (1) ·
1995 (1) ·
1996 (1) ·
1998 (1) ·
2002 (1) ·
2003 (1) ·
2004 (1) ·
2006 (1) ·
2008 (1) ·
2014 (1)
Traffic 029:
10 (1) ·
11 (1) ·
122 (1) ·
135 (1) ·
144 (1) ·
156 (1) ·
173 (1) ·
18 (1) ·
22 (1) ·
23 (1) ·
24 (1) ·
25 (1) ·
27 (1) ·
29 (1) ·
31 (1) ·
32 (1) ·
34 (1) ·
35 (1) ·
350 (1) ·
37 (1) ·
38 (1) ·
39 (1) ·
44 (1) ·
46 (1) ·
47 (1) ·
58 (1) ·
60 (1) ·
62 (1) ·
65 (1) ·
68 (1) ·
70 (1) ·
78 (1) ·
79 (1) ·
82 (1) ·
83 (1) ·
84 (1) ·
89 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Future 114:
Showing below up to 45 results in range #1 to #45.
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch