Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CLINT MOORE RD EB ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'Dunn Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'Loxahatchee Slough' (1) ·
'NB US-27 SR-25 ' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR-406 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'St. Johns Heritage' (1) ·
'SW 23 Ave Golf Rd ' (1)
700227 (1) ·
704190 (1) ·
794189 (1) ·
930303 (1) ·
930304 (1) ·
930352 (1) ·
930353 (1) ·
930370 (1) ·
930437 (1) ·
931003 (1) ·
934160 (1) ·
934161 (1) ·
934167 (1) ·
934948 (1) ·
934969 (1)
'0.5Mi WEST OF CR-809 ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.9 Miles South of US-192' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Just West of I 95 ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'Palm Beach - Broward Line' (1) ·
'SR-406 over Indian River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)