bridge data > Traffic Year 030:
2016
& Inspect Date 090:
03-16
& Scour 113:
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.
Use the filters below to narrow your results.
704063 (1) ·
790012 (1) ·
794009 (1) ·
794010 (1) ·
794019 (1) ·
794036 (1) ·
794045 (1) ·
880005 (1) ·
880077 (1) ·
930339 (1)
'0.1 Mi North of Taylor Rd' (1) ·
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.2 mi E of CR-415 ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'City of Jupiter ' (1) ·
'US-1 over Reed Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·