Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ATLANTIS WATERWAY ' (1) ·
'CANAL ' (1) ·
'COLLIER WATERWAY ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Halifax Canal ' (1) ·
'HUNGERFORD CANAL ' (1) ·
'L.W.D.D. #10 ' (1) ·
'Lake Osborne ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'Misner Branch ' (1) ·
'RELIEF CANAL ' (1) ·
'Rose Bay Canal ' (1) ·
'SCOTTS CANAL ' (1)
'ALLAMANDA BLVD. ' (1) ·
'AUDUBON BLVD. ' (1) ·
'Camp Site Road ' (1) ·
'Center Avenue ' (1) ·
'DAVIS ROAD ' (1) ·
'ENGLAR DRIVE ' (1) ·
'Hurley Blvd ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'Main Street ' (1) ·
'Main Trail ' (1) ·
'MONET ROAD ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'ORANGE TREE DR ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'TROON DR ' (1)
705919 (1) ·
794122 (1) ·
795521 (1) ·
796000 (1) ·
885601 (1) ·
885603 (1) ·
934373 (1) ·
934420 (1) ·
934421 (1) ·
935001 (1) ·
935002 (1) ·
935502 (1) ·
936551 (1) ·
937001 (1) ·
937003 (1) ·
937201 (1) ·
937352 (1) ·
937361 (1) ·
937362 (1) ·
937363 (1)
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'At Intersection w LPGA BL' (1) ·
'In John Prince Park ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)