Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CONGRESS AVE ' (1) ·
'East Island Access' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PARK AVE. W. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'WB Spanish River ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700109 (1) ·
700149 (1) ·
890149 (1) ·
930154 (1) ·
930226 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
931006 (1) ·
934164 (1) ·
934470 (1)
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'1.5 miles South of SR 806' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-80 & Military Trail ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
12318 (1) ·
12839 (1) ·
15528 (1) ·
171592 (1) ·
181308 (1) ·
18500 (1) ·
36435 (1) ·
43375 (1) ·
44197 (1) ·
74605 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)