Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'53RD STREET ' (1) ·
'97 TH STREET ' (1) ·
'BRITT RD ' (1) ·
'Fifth Street ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'Lake Worth Road ' (1) ·
'Levee Road ' (1) ·
'MISSION HILL ROAD ' (1) ·
'PALMETTO PK RD ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-91TPK NBSB 97.4' (1)
795701 (1) ·
884003 (1) ·
884036 (1) ·
884063 (1) ·
884064 (1) ·
894000 (1) ·
930401 (1) ·
930413 (1) ·
930456 (1) ·
930811 (1) ·
931004 (1) ·
934213 (1) ·
934902 (1) ·
935305 (1)
'0.1mi E of Riverside Dr ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'1Mi W of US-1 ' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT 141st ST ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)