Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th St. Canal ' (1) ·
'C-18 Canal ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'Lateral C Canal ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'M CANAL ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 60 ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'TEN MILE CREEK ' (1)
'EB US 98 SR 80 ' (1) ·
'HAVERHILL ROAD ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'Indiantown Rd. ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'Quantum Blvd. ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-808 Glades Road' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'US-1 ' (1) ·
'W. CAMINO REAL ' (1) ·
'WB US 98 SR 80 ' (1)
790013 (1) ·
880102 (1) ·
884076 (1) ·
930015 (1) ·
930188 (1) ·
930189 (1) ·
930201 (1) ·
930325 (1) ·
930391 (1) ·
930412 (1) ·
930447 (1) ·
930461 (1) ·
930524 (1) ·
934256 (1) ·
934406 (1) ·
934924 (1) ·
936375 (1) ·
940072 (1) ·
940152 (1)
'.5 mi East of I-95 ' (1) ·
'0.19Mi. E of Congress Ave' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Boca Raton ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-95 over SR-60 ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'US-1 over 11th Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
107570 (1) ·
113642 (1) ·
133595 (1) ·
157018 (1) ·
171592 (1) ·
177838 (1) ·
18391 (1) ·
27066 (1) ·
29842 (1) ·
3600 (1) ·
42508 (1) ·
45110 (1) ·
49014 (1) ·
51387 (1) ·
69920 (1) ·
75473 (1) ·
99763 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)