Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CONGRESS AVE ' (1) ·
'Congress Avenue ' (1) ·
'CR-880 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PARK AVE. W. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-407 NB ' (1) ·
'SR-472 EB ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'Tomoka Farms Rd. ' (1)
700002 (1) ·
700083 (1) ·
700085 (1) ·
700102 (1) ·
700103 (1) ·
700116 (1) ·
700149 (1) ·
700156 (1) ·
790053 (1) ·
790105 (1) ·
930381 (1) ·
930419 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
930520 (1) ·
930528 (1) ·
930940 (1) ·
931006 (1) ·
934164 (1) ·
934470 (1)
'0.1MI W of US-98 / SR-441' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'1.5 miles South of SR 806' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'At Exit 74 ' (1) ·
'Between SR704 and 12th St' (1) ·
'I-95 SB - CR-5A ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'SR-80 & Military Trail ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
I-95 NB and CR-5A (1)
80050018 (1) ·
80052000 (1) ·
80052100 (1) ·
80052450 (1) ·
80052810 (1) ·
80053227 (1) ·
80064300 (1) ·
80075174 (1) ·
80075197 (1) ·
80102834 (1) ·
80232057 (1) ·
80362348 (1) ·
80362349 (1) ·
80472199 (1) ·
80472690 (1) ·
80472715 (1) ·
80522877 (1) ·
80533778 (1) ·
80533868 (1) ·
81045886 (1) ·
81152780 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
11798 (1) ·
12145 (1) ·
12318 (1) ·
12839 (1) ·
171592 (1) ·
17280 (1) ·
181308 (1) ·
25158 (1) ·
28350 (1) ·
33486 (1) ·
36435 (1) ·
369555 (1) ·
43375 (1) ·
74605 (1) ·
82412 (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)