Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'C-51 Canal ' (1) ·
'CR-3 ' (1) ·
'Deep Creek ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'HAULOVER CANAL ' (1) ·
'I-95 ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'Turkey Creek ' (1) ·
'Turnbull Creek ' (1) ·
'US-1 ' (1)
'COURTENAY PARKWAY ' (1) ·
'CR708 125.4 ' (1) ·
'Dairy Rd ' (1) ·
'Haverhill Rd ' (1) ·
'Hull Road ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'LPGA Blvd ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 WB ' (1) ·
'SR-44 ' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-17 ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1)
700029 (1) ·
700079 (1) ·
700135 (1) ·
700203 (1) ·
703004 (1) ·
790002 (1) ·
790021 (1) ·
790079 (1) ·
790086 (1) ·
790097 (1) ·
790149 (1) ·
790171 (1) ·
790217 (1) ·
890119 (1) ·
930335 (1) ·
930336 (1) ·
930497 (1) ·
930498 (1) ·
934295 (1) ·
940121 (1)
'0.1 MILE WEST OF I-95 ' (1) ·
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'Dairy Rd - I-95 ' (1) ·
'Hull Road - I-95 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR-404 WB over CR-3 ' (1) ·
'SR-405 WB - US-1 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
'US-1 over Turkey Creek ' (1) ·
'US-1 SB - Turnbull Creek ' (1) ·
'US-17 over Deep Creek ' (1) ·
'US-92 EB -Tomoka River ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)