Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Berrys Canal ' (1) ·
'C-23 CANAL ' (1) ·
'E-1 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Header Canal ' (1) ·
'I-95 (SR-9) ' (1) ·
'Indian River East Relief' (1) ·
'Intracoastal Waterway ' (1) ·
'North Relief Canal ' (1) ·
'SR-44 ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-91 N/S TPK ' (1) ·
'Tomoka River ' (1) ·
'US-1 & FECRR ' (1) ·
'US-92 ' (1)
'56th Place North ' (1) ·
'Forest Hill Blvd. ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR-44 ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR91 On/Off Rmp106' (1) ·
'US-1 (SR-5) ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB SR 70 ' (1)
790064 (1) ·
790072 (1) ·
790077 (1) ·
790078 (1) ·
790128 (1) ·
790149 (1) ·
884082 (1) ·
890110 (1) ·
890111 (1) ·
890146 (1) ·
930004 (1) ·
930183 (1) ·
931011 (1) ·
934327 (1) ·
934908 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940119 (1) ·
940162 (1) ·
940163 (1)
'.75mi E. of Indian R Dr. ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'56th Place North ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-710 TPK Interchange ' (1)
26210242 (1) ·
26390331 (1) ·
26422223 (1) ·
26481194 (1) ·
26495569 (1) ·
27121953 (1) ·
27122261 (1) ·
27151700 (1) ·
27172347 (1) ·
27222475 (1) ·
27271705 (1) ·
27271802 (1) ·
27281041 (1) ·
27281411 (1) ·
27413623 (1) ·
29004602 (1) ·
29011550 (1) ·
29014148 (1) ·
29102131 (1) ·
29154558 (1) ·
29154580 (1)
80033671 (1) ·
80043087 (1) ·
80043210 (1) ·
80075297 (1) ·
80121068 (1) ·
80124800 (1) ·
80235637 (1) ·
80235639 (1) ·
80240091 (1) ·
80240291 (1) ·
80251481 (1) ·
80252971 (1) ·
80254109 (1) ·
80260616 (1) ·
80295022 (1) ·
80551845 (1) ·
80553031 (1) ·
80591757 (1) ·
81050336 (1) ·
81070414 (1) ·
81070520 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)