Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Blue Lake Equalizer ' (1) ·
'BRANCH OF ICWW ' (1) ·
'BRITT CANAL ' (1) ·
'Canal ' (1) ·
'Cow Creek ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'Halifax River ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'M CANAL ' (1) ·
'Nav. Banana River Canal ' (1) ·
'SFWMD L-13 CANAL ' (1) ·
'Tomoka River ' (1)
'21ST ST SW ' (1) ·
'53RD STREET ' (1) ·
'BRITT RD ' (1) ·
'CONGRESS AVE ' (1) ·
'CONGRESS AVE SB ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-700 ' (1) ·
'E. Minnesota Ave. ' (1) ·
'Entrnce Rd to FDOT' (1) ·
'Girard Blvd. ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LINTON BLVD. ' (1) ·
'Magnolia Avenue ' (1) ·
'Maytown Road ' (1) ·
'Old Dixie Hwy. ' (1) ·
'SE HARBOR ISLAND ' (1) ·
'STAR ISLAND WAY ' (1) ·
'SW 23RD AVE. ' (1)
704016 (1) ·
704019 (1) ·
794014 (1) ·
794015 (1) ·
794016 (1) ·
794032 (1) ·
880044 (1) ·
880047 (1) ·
884036 (1) ·
884047 (1) ·
894000 (1) ·
894017 (1) ·
894018 (1) ·
894021 (1) ·
930085 (1) ·
930302 (1) ·
930322 (1) ·
934125 (1) ·
934258 (1) ·
934931 (1)
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.2 Mi East of US-1 ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'1Mi W of US-1 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'3MI W OF CR-615 ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'8.3 miles East of SR-415 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'INT. OF CR-700 & CR-880 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)