Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'CITY OF WPB CANAL ' (1) ·
'CLEAR LAKE ' (1) ·
'E-2 Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD L-2 Canal ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1)
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'E/B S.R. 704 ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'Pioneer Road ' (1) ·
'Riverbend Park Rd ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'Southern Boulevard' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR91 SB TPK 100.15' (1) ·
'W/B S.R. 704 ' (1)
930097 (1) ·
930142 (1) ·
930367 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
930506 (1) ·
930507 (1) ·
934176 (1) ·
934254 (1) ·
934277 (1) ·
934278 (1) ·
934721 (1) ·
937703 (1) ·
937707 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'Just N. of Southern Blvd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.