Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'Cabana Colony Circle ' (1) ·
'East Indian River Relief' (1) ·
'FL. TURNPIKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'N Fork Loxahatchee River' (1) ·
'None ' (1) ·
'Pine Street ' (1) ·
'Reed Canal ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'West Indian River Relief' (1)
'CR-812 OCEAN AVE ' (1) ·
'East Island Access' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'NB I 95 to Gateway' (1) ·
'Oak Lea Drive ' (1) ·
'Prosperity Farms R' (1) ·
'SR-528 EB ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'West Island Access' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
700151 (1) ·
796548 (1) ·
890148 (1) ·
890149 (1) ·
930435 (1) ·
934178 (1) ·
934345 (1) ·
934346 (1) ·
934369 (1) ·
934925 (1) ·
934926 (1) ·
934938 (1) ·
934939 (1) ·
934945 (1) ·
934946 (1) ·
934951 (1) ·
934952 (1) ·
936776 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'West of Ernest Lyons Bri.' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)