Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'JOANN CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'Nav. Banana River Canal ' (1) ·
'NORTH CANAL ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'RANGE LINE CANAL ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'Tomoka River ' (1) ·
'WPB CANAL C-51 ' (1)
'21ST ST SW ' (1) ·
'53RD STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-717 ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'DUDA ROAD ' (1) ·
'E. CAMINO REAL ' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'Girard Blvd. ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'LINTON BLVD. ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'Old Dixie Hwy. ' (1) ·
'SUMMIT BLVD ' (1)
704016 (1) ·
794016 (1) ·
880063 (1) ·
884019 (1) ·
884027 (1) ·
884028 (1) ·
884036 (1) ·
884038 (1) ·
884047 (1) ·
884058 (1) ·
884060 (1) ·
890107 (1) ·
930026 (1) ·
930072 (1) ·
930322 (1) ·
934201 (1) ·
934332 (1) ·
934408 (1) ·
934516 (1) ·
934519 (1)
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'500FT WEST OF I-95 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'AT CR-615 (66TH AVE.) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)