Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'C-52 Canal ' (1) ·
'Canal C-46 ' (1) ·
'Canal L-14 ' (1) ·
'Cow Creek ' (1) ·
'CSX RR ' (1) ·
'DRAINAGE CANAL ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'L.W.D.D L-14 CANAL ' (1) ·
'LEVEE NO.8 ' (1) ·
'LWDD E-4 Canal ' (1) ·
'ORANGE CANAL ' (1) ·
'SR-91 (Fl. Tpk.) ' (1)
'10th Ave North ' (1) ·
'Becker Rd. ' (1) ·
'CENTER DR. ' (1) ·
'Congress Ave. ' (1) ·
'CR-726 CITRUS BLVD' (1) ·
'CR-880 ' (1) ·
'Eldron Blvd. ' (1) ·
'JOG ROAD ' (1) ·
'Maytown Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'Quantum Blvd. ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80WB (Southern)' (1)
705917 (1) ·
794032 (1) ·
880090 (1) ·
880091 (1) ·
890159 (1) ·
894029 (1) ·
930163 (1) ·
930263 (1) ·
930265 (1) ·
930351 (1) ·
930407 (1) ·
930486 (1) ·
934297 (1) ·
934350 (1) ·
936375 (1) ·
941001 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3MI E OF CONGRESS AVE ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'10th Ave North over I 95 ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'5.8Mi. E of SR-710 ' (1) ·
'8.3 miles East of SR-415 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)