Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700002 (1) ·
700029 (1) ·
700058 (1) ·
700059 (1) ·
700103 (1) ·
700116 (1) ·
700132 (1) ·
700133 (1) ·
700134 (1) ·
700135 (1) ·
700229 (1) ·
704048 (1)
'0.2 mile East of US-1 ' (1) ·
'0.25 Mi. West of SR-405 ' (1) ·
'Dairy Rd - I-95 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 NB over SR-50 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-405 WB - US-1 ' (1) ·
I-95 over Addison Canal (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)