Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRITT CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'FL TPK (SR-91) ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'LAKE WORTH ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'Lateral D Canal ' (1) ·
'Main Relief Canal ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'S-5 Discharge Canal ' (1) ·
'SALERNO CREEK ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'Yacht Club Cut ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'53RD STREET ' (1) ·
'65TH ST. ' (1) ·
'66th Avenue ' (1) ·
'8TH ST. CR-612 ' (1) ·
'97 TH STREET ' (1) ·
'BRITT RD ' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Enterprise Rd. ' (1) ·
'Fifth Street ' (1) ·
'ISLAND ROAD ' (1) ·
'Levee Road ' (1) ·
'MISSION HILL ROAD ' (1) ·
'Roebuck Road ' (1) ·
'Service Road ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB US 98 SR 80 ' (1)
790191 (1) ·
795701 (1) ·
880049 (1) ·
884003 (1) ·
884024 (1) ·
884036 (1) ·
884063 (1) ·
884064 (1) ·
884098 (1) ·
884099 (1) ·
894000 (1) ·
894041 (1) ·
930006 (1) ·
930462 (1) ·
930539 (1) ·
930811 (1) ·
931013 (1) ·
934283 (1) ·
934517 (1) ·
935305 (1) ·
936802 (1)
'0.1mi E of Riverside Dr ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'1Mi W of US-1 ' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'AT 141st ST ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'No. City Line Boca Raton ' (1) ·
'Palm Beach Garden Interch' (1) ·
'SR 80 / I-95 Interchange ' (1)
26252016 (1) ·
26284041 (1) ·
26294400 (1) ·
26403385 (1) ·
26403455 (1) ·
26410978 (1) ·
26414288 (1) ·
26441137 (1) ·
26503846 (1) ·
27084441 (1) ·
27140482 (1) ·
27363546 (1) ·
27370119 (1) ·
27374280 (1) ·
27412374 (1) ·
27424275 (1) ·
27461915 (1) ·
27464527 (1) ·
27473810 (1) ·
28531327 (1) ·
29004760 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)