Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
794022 (1) ·
794065 (1) ·
794130 (1) ·
795700 (1) ·
796500 (1) ·
884024 (1) ·
930005 (1) ·
930097 (1) ·
930098 (1) ·
934408 (1) ·
944010 (1)
'.5MI W of A1A & E of SR-5' (1) ·
'0.13mi NW from N Causeway' (1) ·
'0.1Mi W of Marsh Road ' (1) ·
'0.25mi W of S.R.-A1A ' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'AT 74TH AVE. ' (1) ·
'Intrsect w Reed Canal Rd ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)