Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'CLEAR LAKE ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-2 CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'Summit Boulevard ' (1) ·
'WPB STUB CANAL ' (1) ·
'WPB WATER SUPPLY CANAL ' (1)
'45TH STREET ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BELVEDERE RD ' (1) ·
'CONGRESS AVE ' (1) ·
'EB SR 704 ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'PALM B LAKE BVD WB' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SUMMIT BLVD ' (1) ·
'VILLAGE BLVD ' (1) ·
'W/B S.R. 704 ' (1)
930183 (1) ·
930210 (1) ·
930291 (1) ·
930292 (1) ·
930294 (1) ·
930367 (1) ·
934100 (1) ·
934208 (1) ·
934224 (1) ·
934228 (1) ·
934251 (1) ·
934254 (1) ·
934277 (1) ·
937706 (1) ·
937707 (1) ·
937712 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.8MI S OF 45TH ST CR702 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 / SR 882 ' (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)