Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBARA BASIN ' (1) ·
'BRANCH OF INDIAN RIVER ' (1) ·
'C-17 CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'Earman River (C-17) ' (1) ·
'East Indian River Relief' (1) ·
'ICWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'North Lake ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'TIDAL CANAL ' (1) ·
'Tide Relief Canal ' (1) ·
'West Indian River Relief' (1) ·
'WILLOUGHBY CREEK ' (1)
'East Island Access' (1) ·
'EB North Lake Blvd' (1) ·
'ISLAND RD. ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'PARK AVE. W. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SIMARA STREET ' (1) ·
'SR-A1A ' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'US-1 (SR-5) ' (1) ·
'WB N. Lake Blvd. ' (1) ·
'West Island Access' (1)
890102 (1) ·
890148 (1) ·
890149 (1) ·
890150 (1) ·
895501 (1) ·
895504 (1) ·
895505 (1) ·
930003 (1) ·
930004 (1) ·
930050 (1) ·
930195 (1) ·
930361 (1) ·
934116 (1) ·
934164 (1) ·
936550 (1)
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'A1A on Singer Island ' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'Just North of SR-850 ' (1) ·
'West of Ernest Lyons Bri.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)