Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'E-2 Canal ' (1) ·
'Earman River (C-17) ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'North Lake ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'OCEAN CANAL L-13 ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'Tide Relief Canal ' (1)
'DUDA ROAD ' (1) ·
'EB North Lake Blvd' (1) ·
'HARRIS RD ' (1) ·
'Hatton Road ' (1) ·
'Levee Road ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'PARK AVE. W. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SAM SENTER RD ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-715 ' (1) ·
'SR-A1A ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB N. Lake Blvd. ' (1)
930003 (1) ·
930004 (1) ·
930030 (1) ·
930050 (1) ·
930195 (1) ·
930338 (1) ·
930360 (1) ·
930361 (1) ·
930471 (1) ·
930805 (1) ·
930806 (1) ·
934116 (1) ·
934164 (1) ·
934513 (1) ·
934515 (1) ·
934519 (1) ·
934552 (1) ·
935100 (1) ·
936550 (1)
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'A1A on Singer Island ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At East Canal St. ' (1) ·
'AT TEDDAR ROAD ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'Just North of SR-850 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)