Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EB SR706 ' (1) ·
'Indiantown Rd. ' (1) ·
'Indiantown Road ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR 706 ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
894019 (1) ·
930005 (1) ·
930239 (1) ·
930241 (1) ·
930339 (1) ·
930382 (1) ·
930383 (1) ·
930385 (1) ·
930390 (1) ·
930391 (1) ·
930420 (1) ·
930453 (1) ·
930454 (1) ·
931012 (1) ·
934179 (1)
'.5 mi East of I-95 ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.25 Mile N of Center St.' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'City of Jupiter ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'SR 91 at Jupiter Interch ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)