Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-18 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'Clint Moore Road ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SR 60 ' (1) ·
'SR 808 GLADES RD ' (1) ·
Indian River Relief East (1)
'BELVEDERE ROAD ' (1) ·
'BIG BLUE TRACE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CONGRESS AVE ' (1) ·
'Indiantown Rd. ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-808 Glades Road' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 96.55' (1) ·
SR-520 (1)
700196 (1) ·
880102 (1) ·
930015 (1) ·
930325 (1) ·
930391 (1) ·
930412 (1) ·
930416 (1) ·
930438 (1) ·
930447 (1) ·
931000 (1) ·
934212 (1) ·
934282 (1) ·
934470 (1) ·
934491 (1) ·
934924 (1)
'.5 mi East of I-95 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-95 over SR-60 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
107570 (1) ·
113642 (1) ·
133595 (1) ·
171592 (1) ·
185298 (1) ·
19258 (1) ·
43375 (1) ·
51387 (1) ·
63327 (1) ·
75473 (1) ·
78700 (1) ·
79810 (1) ·
8000 (1) ·
99763 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)