Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'17th Avenue North ' (1) ·
'6th Avenue South ' (1) ·
'C-51 Canal ' (1) ·
'CSX RR ' (1) ·
'FIVE MILE CREEK ' (1) ·
'FL TPK SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'Kellers Canal ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'LK OSBORNE DR& CENTER DR' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'TEN MILE CREEK ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'10th Ave. North ' (1) ·
'10th Ave North ' (1) ·
'6 Ave S to NB I-95' (1) ·
'6TH AVE SO. EB ' (1) ·
'6TH AVE SO. WB ' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'EB SR 802 Lake Ave' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'KELLER ROAD ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR802 (Lake Worth)' (1) ·
'WB SR 802 Lake Ave' (1)
930073 (1) ·
930104 (1) ·
930259 (1) ·
930260 (1) ·
930261 (1) ·
930262 (1) ·
930263 (1) ·
930273 (1) ·
930318 (1) ·
930373 (1) ·
930458 (1) ·
930508 (1) ·
930509 (1) ·
930510 (1) ·
930511 (1) ·
934302 (1) ·
934307 (1) ·
934367 (1) ·
934940 (1) ·
936350 (1) ·
940015 (1) ·
940067 (1) ·
940070 (1)
'.4mi. East of Congress ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.2MI S OF EDWARDS RD ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.6MI WEST OF I-95 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'10th Ave North over I 95 ' (1) ·
'10th Ave over I 95 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'Lake Worth ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1)
26295449 (1) ·
26342040 (1) ·
26360600 (1) ·
26363210 (1) ·
26363334 (1) ·
26363379 (1) ·
26363990 (1) ·
26364054 (1) ·
26364900 (1) ·
26365544 (1) ·
26365576 (1) ·
26370205 (1) ·
26374030 (1) ·
26374035 (1) ·
26381065 (1) ·
26381073 (1) ·
26383999 (1) ·
26384400 (1) ·
26384575 (1) ·
27241547 (1) ·
27243079 (1) ·
27245404 (1)
80022882 (1) ·
80024618 (1) ·
80032221 (1) ·
80040290 (1) ·
80040600 (1) ·
80040610 (1) ·
80040620 (1) ·
80040645 (1) ·
80040685 (1) ·
80040715 (1) ·
80040740 (1) ·
80040800 (1) ·
80040830 (1) ·
80040879 (1) ·
80041919 (1) ·
80043911 (1) ·
80043925 (1) ·
80050085 (1) ·
80075212 (1) ·
80102300 (1) ·
80212904 (1) ·
80214936 (1) ·
80215950 (1)
10500 (1) ·
10516 (1) ·
113000 (1) ·
116000 (1) ·
1200 (1) ·
15000 (1) ·
190500 (1) ·
21000 (1) ·
23000 (1) ·
232000 (1) ·
23500 (1) ·
236000 (1) ·
28500 (1) ·
3240 (1) ·
4483 (1) ·
500 (1) ·
7350 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
12752 (1) ·
13145 (1) ·
1500 (1) ·
18218 (1) ·
196055 (1) ·
201260 (1) ·
30000 (1) ·
330518 (1) ·
36435 (1) ·
39905 (1) ·
402520 (1) ·
40773 (1) ·
409460 (1) ·
49447 (1) ·
49448 (1) ·
5205 (1) ·
7778 (1) ·
850 (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)