Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'C-52 Canal ' (1) ·
'CANAL ' (1) ·
'Canal C-47 ' (1) ·
'Canal C-48 ' (1) ·
'E-3 CANAL ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'ITCWD CANAL 3 ' (1) ·
'LEVEE NO.8 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-91 (Fl. Tpk.) ' (1)
'Becker Rd. ' (1) ·
'BISCAYNE DRIVE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'Brittan Avenue ' (1) ·
'Caballero Ave ' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Eldron Blvd ' (1) ·
'JOG ROAD ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 SB TPK 178.03' (1)
705913 (1) ·
705914 (1) ·
705915 (1) ·
705916 (1) ·
880058 (1) ·
880066 (1) ·
880090 (1) ·
880091 (1) ·
890001 (1) ·
890021 (1) ·
890159 (1) ·
930265 (1) ·
930407 (1) ·
930438 (1) ·
930486 (1) ·
934291 (1) ·
934294 (1) ·
934296 (1) ·
934297 (1) ·
935750 (1) ·
937358 (1) ·
937359 (1) ·
937361 (1) ·
937363 (1) ·
941001 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
26314057 (1) ·
26373441 (1) ·
26410722 (1) ·
26412597 (1) ·
26412599 (1) ·
26415366 (1) ·
26420393 (1) ·
26421351 (1) ·
26430840 (1) ·
26433343 (1) ·
26435320 (1) ·
26435409 (1) ·
26502106 (1) ·
27023798 (1) ·
27023948 (1) ·
27094100 (1) ·
27123412 (1) ·
27333350 (1) ·
27333415 (1) ·
27382573 (1) ·
27382633 (1) ·
27583729 (1) ·
27583761 (1) ·
27590343 (1) ·
27590359 (1)
80035976 (1) ·
80070222 (1) ·
80070240 (1) ·
80074689 (1) ·
80074708 (1) ·
80075210 (1) ·
80085094 (1) ·
80130371 (1) ·
80130890 (1) ·
80133989 (1) ·
80134000 (1) ·
80142395 (1) ·
80143409 (1) ·
80144092 (1) ·
80181600 (1) ·
80200100 (1) ·
80214953 (1) ·
80394165 (1) ·
80394182 (1) ·
80400209 (1) ·
80400429 (1) ·
80403783 (1) ·
80403784 (1) ·
80434234 (1) ·
80434242 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)