Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
894014 (1) ·
894049 (1) ·
895501 (1) ·
895505 (1) ·
930805 (1) ·
931001 (1) ·
931006 (1) ·
935303 (1) ·
940160 (1) ·
940161 (1)
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'300FT East of CR-717 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Crosstown Pkwy/I-95 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)