Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER C-25 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'ICWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L.W.D.D. #9 ' (1) ·
'MAPLE CREEK ' (1) ·
'N CANAL ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Rowland Canal ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'ST LUCIE CANAL ' (1) ·
'TAYLOR CREEK ' (1) ·
'WILLOUGHBY CREEK ' (1)
'CR5A OLD DIXIE HWY' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'DAVIS ROAD ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'E. CAMINO REAL ' (1) ·
'GOLDFINCH LANE ' (1) ·
'ISLAND DRIVE ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'MAPP RD ' (1) ·
'PARK AVE. W. ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-98 (SR-80) ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'West Farms Road ' (1)
880062 (1) ·
890066 (1) ·
890102 (1) ·
890150 (1) ·
894033 (1) ·
894056 (1) ·
930053 (1) ·
930381 (1) ·
930419 (1) ·
930450 (1) ·
934164 (1) ·
934408 (1) ·
934506 (1) ·
935506 (1) ·
937202 (1) ·
937354 (1) ·
940029 (1) ·
940050 (1) ·
944014 (1)
'.25m W of US-1 on US-98 ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'At ANGLE RD(CR-607A) ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.