Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'C-15 Canal ' (1) ·
'Clint Moore Road ' (1) ·
'E-3 CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'ICWW ' (1) ·
'JONES CREEK ' (1) ·
'Lake Worth Relief ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'None ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'ROY'S SWALE ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Taylor Creek ' (1)
'Blue Heron Blvd ' (1) ·
'CENTER STREET ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'CLINT MOORE RD. WB' (1) ·
'CR-512 ' (1) ·
'E Gateway Blvd ' (1) ·
'EB Lake Worth Rd. ' (1) ·
'EB SR 704 ' (1) ·
'I 95 SR 9 ' (1) ·
'Juanita Ave. ' (1) ·
'Lantana Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I 95 to Gateway' (1) ·
'SB I 95 SR9 ' (1) ·
'SILVER FOX LANE ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR-91 TPK NB 131.0' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'ST LUCIE W BLVD EB' (1)
884068 (1) ·
890150 (1) ·
891000 (1) ·
894042 (1) ·
930210 (1) ·
930273 (1) ·
930294 (1) ·
930329 (1) ·
930371 (1) ·
930434 (1) ·
930435 (1) ·
930445 (1) ·
930545 (1) ·
931000 (1) ·
934147 (1) ·
934366 (1) ·
934966 (1) ·
934967 (1) ·
944017 (1) ·
949902 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.1Mi W of US-1 ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1 mile North of SR 812 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Mile E of US441 ' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / SR 882 ' (1) ·
'SR-A1A East of ICWW ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12319 (1) ·
171592 (1) ·
175235 (1) ·
1800 (1) ·
22070 (1) ·
22555 (1) ·
25331 (1) ·
26400 (1) ·
26546 (1) ·
28275 (1) ·
330 (1) ·
330518 (1) ·
37303 (1) ·
38517 (1) ·
392110 (1) ·
55954 (1) ·
65930 (1) ·
70268 (1) ·
7500 (1)
Showing below up to 20 results in range #1 to #20.