Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'CLEAR LAKE ' (1) ·
'CSX RAILROAD ' (1) ·
'Drainage Canal ' (1) ·
'Earman River (C-17) ' (1) ·
'EPB - 10 Canal ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'Hillsboro Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'Loxahatchee River ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'SR-710 ' (1) ·
'SR-91 Turnpike ' (1) ·
'SWA Retention Canal ' (1) ·
'Turnpike (SR-91) ' (1) ·
'WPB STUB CANAL ' (1)
'45th Street CR-702' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BELVEDERE RD ' (1) ·
'EB SR 704 ' (1) ·
'Haverhill Road ' (1) ·
'I 95 SR 9 ' (1) ·
'Jog Road ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'PARK AVE. W. ' (1) ·
'PLM BEACH LAKES BL' (1) ·
'Private Road ' (1) ·
'PROSPERITY FARMS R' (1) ·
'Riverbend Park Rd ' (1) ·
'Southern Boulevard' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 SB TPK 100.15' (1) ·
'U.S.-1 (SR-5) ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-98 (SR-80) ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB Okee. Blvd. ' (1)
930003 (1) ·
930004 (1) ·
930053 (1) ·
930097 (1) ·
930142 (1) ·
930183 (1) ·
930190 (1) ·
930210 (1) ·
930235 (1) ·
930294 (1) ·
930417 (1) ·
930470 (1) ·
930506 (1) ·
930812 (1) ·
934116 (1) ·
934158 (1) ·
934164 (1) ·
934166 (1) ·
934171 (1) ·
934176 (1) ·
934208 (1) ·
934277 (1) ·
936550 (1) ·
937707 (1) ·
937709 (1)
'.25m W of US-1 on US-98 ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.3 Mi N of 45th St ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'800 ft. S of SR 704 Exit ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'I-95 / SR 882 ' (1) ·
'Just North of SR-850 ' (1) ·
'Port of Palm Beach ' (1) ·
'SR-704 Over SR-91 ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
26210580 (1) ·
26391930 (1) ·
26403161 (1) ·
26403272 (1) ·
26412668 (1) ·
26420100 (1) ·
26422136 (1) ·
26422200 (1) ·
26422223 (1) ·
26422817 (1) ·
26423954 (1) ·
26430400 (1) ·
26430410 (1) ·
26432857 (1) ·
26450626 (1) ·
26453630 (1) ·
26454160 (1) ·
26455503 (1) ·
26460153 (1) ·
26475062 (1) ·
26483005 (1) ·
26485165 (1) ·
26490288 (1) ·
26495569 (1) ·
26555800 (1)
80024000 (1) ·
80025423 (1) ·
80031952 (1) ·
80032135 (1) ·
80032393 (1) ·
80033598 (1) ·
80033671 (1) ·
80040030 (1) ·
80040084 (1) ·
80040599 (1) ·
80041030 (1) ·
80041580 (1) ·
80041855 (1) ·
80042484 (1) ·
80043087 (1) ·
80043390 (1) ·
80052450 (1) ·
80065835 (1) ·
80080080 (1) ·
80080366 (1) ·
80081956 (1) ·
80082635 (1) ·
80082890 (1) ·
80104200 (1) ·
80165951 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)