Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930073 (1) ·
930104 (1) ·
930260 (1) ·
930263 (1) ·
930273 (1) ·
930318 (1) ·
930508 (1) ·
930509 (1) ·
930510 (1) ·
930511 (1) ·
934126 (1)
'.4mi. East of Congress ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'10th Ave over I 95 ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)