Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'10th Ave. North ' (1) ·
'10th Ave North ' (1) ·
'6 Ave S to NB I-95' (1) ·
'Congress Ave. ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'I 95 SR 9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'ORANGE TREE DR ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'SR802 (Lake Worth)' (1) ·
'TROON DR ' (1) ·
'WB SR 802 Lake Ave' (1)
930073 (1) ·
930104 (1) ·
930163 (1) ·
930260 (1) ·
930263 (1) ·
930273 (1) ·
930318 (1) ·
930508 (1) ·
930509 (1) ·
930510 (1) ·
930511 (1) ·
935001 (1) ·
935002 (1)
'.4mi. East of Congress ' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'10th Ave over I 95 ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.