Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
885601 (1) ·
885602 (1) ·
885603 (1) ·
885604 (1) ·
885605 (1) ·
930030 (1) ·
930360 (1) ·
935001 (1) ·
935002 (1) ·
935100 (1) ·
935218 (1) ·
935222 (1) ·
935900 (1) ·
937201 (1) ·
937202 (1)
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'200ft. W of A1A ' (1) ·
'750FT W OF SR-7 (US-441) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)