Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'JOANN CANAL ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'LATERAL A CANAL ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'NORTH CANAL ' (1) ·
'PHIPP CANAL ' (1) ·
'RANGE LINE CANAL ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (STUART INT) ' (1)
'53RD STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'WB Spanish River ' (1)
884019 (1) ·
884027 (1) ·
884028 (1) ·
884036 (1) ·
884038 (1) ·
884058 (1) ·
884060 (1) ·
885601 (1) ·
890068 (1) ·
890082 (1) ·
890085 (1) ·
890107 (1) ·
930154 (1) ·
930226 (1) ·
930235 (1) ·
930334 (1) ·
940049 (1) ·
940050 (1)
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.