Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'C-23 CANAL ' (1) ·
'COLLIER CREEK ' (1) ·
'EL RIO CANAL ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'RETENTION POND ' (1) ·
'ROY'S SWALE ' (1) ·
'SR 91 TPK (STUART INT) ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1)
'CORKSCREW BLVD. ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'DYER PARK ROAD ' (1) ·
'FLEMING STREET ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'MURPHY RD ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'Riverbend Park Rd ' (1) ·
'SILVER FOX LANE ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SW 18TH ST ' (1) ·
'WEST OCEAN DRIVE ' (1)
884053 (1) ·
885604 (1) ·
890068 (1) ·
890112 (1) ·
894003 (1) ·
894042 (1) ·
930030 (1) ·
930142 (1) ·
930360 (1) ·
934140 (1) ·
934176 (1) ·
934502 (1) ·
935218 (1) ·
935300 (1) ·
937356 (1) ·
937358 (1) ·
937359 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)