Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'A1A ' (1) ·
'E. CAMINO REAL ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PALMETTO PK RD WB ' (1) ·
'S. VERDE TRAIL ' (1) ·
'Spanish River Blvd' (1) ·
'SR 91 TPK RMP 76.3' (1) ·
'SR-808 Glades Road' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'SW 18TH ST ' (1) ·
'SW 18th STREET EB ' (1) ·
'WB Spanish River ' (1)
930060 (1) ·
930154 (1) ·
930226 (1) ·
930325 (1) ·
930333 (1) ·
930412 (1) ·
930416 (1) ·
930450 (1) ·
931000 (1) ·
934408 (1) ·
934465 (1) ·
934900 (1) ·
934903 (1) ·
934908 (1) ·
935218 (1) ·
935222 (1)
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT BOCA RATON INTERCHANGE' (1) ·
'At S Military Trail ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
107570 (1) ·
10930 (1) ·
15528 (1) ·
16482 (1) ·
171592 (1) ·
17360 (1) ·
18218 (1) ·
185298 (1) ·
19258 (1) ·
21372 (1) ·
28050 (1) ·
38170 (1) ·
600 (1) ·
98895 (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)