Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'DIXIE HIGHWAY ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'Loxahatchee Slough' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'WB Okee. Blvd. ' (1)
890113 (1) ·
930370 (1) ·
930417 (1) ·
930437 (1) ·
931003 (1) ·
934160 (1) ·
934161 (1) ·
934167 (1) ·
934967 (1) ·
934969 (1) ·
935308 (1) ·
940134 (1) ·
949902 (1)
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'SR-704 Over SR-91 ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)