Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-24 Canal ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I-4 EB Ramp B ' (1) ·
'IRRIGATION DITCH #4 ' (1) ·
'L-5 Canal ' (1) ·
'LATERAL CANAL C ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL G CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'Sykes Creek ' (1)
'4TH STREET ' (1) ·
'74TH AVE. ' (1) ·
'90TH AVE ' (1) ·
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'CARTER RD. ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR-632 (65TH ST.) ' (1) ·
'Crosstown Parkway ' (1) ·
'HURON WAY ' (1) ·
'I-4 WB ' (1) ·
'Levee Road ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'RDBGH RD 170.14 ' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1)
700193 (1) ·
790106 (1) ·
880020 (1) ·
880040 (1) ·
884015 (1) ·
884016 (1) ·
884020 (1) ·
884022 (1) ·
884023 (1) ·
894048 (1) ·
930319 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
935209 (1) ·
935210 (1) ·
935507 (1) ·
940060 (1) ·
945274 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'0.8MI E OF 58TH AVE. ' (1) ·
'1.1MI N OF SR-60 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'3.4 MI S INDIAN RIVER CO ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'AT 4TH STREET ' (1) ·
'AT 74TH AVE. ' (1) ·
'I-4 WB over I-4 EB Ramp B' (1) ·
'SR-520 - Sykes Creek ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.