Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
880020 (1) ·
880040 (1) ·
884015 (1) ·
884016 (1) ·
884020 (1) ·
884022 (1) ·
884023 (1) ·
894048 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
935209 (1) ·
935210 (1) ·
935507 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'0.8MI E OF 58TH AVE. ' (1) ·
'1.1MI N OF SR-60 ' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'AT 4TH STREET ' (1) ·
'AT 74TH AVE. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)