Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Scour 113: Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures & Future Year 115: 2038

Use the filters below to narrow your results.

ObjectID:
Status:
Direction 005e:
Features 006a:
Critical 006b:
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Lanes 028a:
2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1) · 7 (1)
Traffic 029:
Traffic Year 030:
Length 049:
Width 052:
0 (1) · 10 (1) · 11 (1) · 12 (1) · 13 (1) · 14 (1) · 15 (1) · 16 (1) · 17 (1) · 18 (1) · 19 (1) · 20 (1) · 21 (1) · 22 (1) · 25 (1) · 27 (1) · 28 (1) · 29 (1) · 30 (1) · 32 (1) · 34 (1) · 37 (1) · 39 (1) · 8 (1) · 9 (1)
Direction 102:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115: (Click arrow to add another value)
Clearance 116:

Showing below up to 114 results in range #1 to #114.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

T


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)