Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cougar Wildlife Crossing' (1) ·
'Cypress Creek ' (1) ·
'Deer Wildlife Crossing ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Header Canal ' (1) ·
'I-95 ' (1) ·
'L-5 CANAL ' (1) ·
'Lantana Road ' (1) ·
'LATERAL A CANAL ' (1) ·
'Long Creek ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'Old Dixie Hwy. & FEC RR ' (1) ·
'Pine Street ' (1) ·
'SR 811 & FEC RR ' (1) ·
'Ten Mile Creek ' (1) ·
'Tillman Canal ' (1) ·
'Tomoka River ' (1)
'49th St Lindsey Rd' (1) ·
'CR-611 (45th ST.) ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'SR-528 EB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB SR 70 ' (1) ·
'WB SR 786 ' (1) ·
'WB St. Lucie Blvd.' (1)
700119 (1) ·
700151 (1) ·
700198 (1) ·
790201 (1) ·
790202 (1) ·
790205 (1) ·
790207 (1) ·
880103 (1) ·
880104 (1) ·
884102 (1) ·
884103 (1) ·
890115 (1) ·
890116 (1) ·
930275 (1) ·
930489 (1) ·
930492 (1) ·
934271 (1) ·
940114 (1) ·
940119 (1) ·
940122 (1) ·
940123 (1) ·
940139 (1) ·
940140 (1) ·
940144 (1) ·
940145 (1)
'.5 miles South of SR-70 ' (1) ·
'0.25 mi N of Belvedere Rd' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'1st overpass east of I-95' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'2.5 miles North of SR-706' (1) ·
'2mi. East of SR-91 ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 EB over Pine St. ' (1)
26351625 (1) ·
26401260 (1) ·
26413720 (1) ·
26503900 (1) ·
26581961 (1) ·
26582109 (1) ·
27161795 (1) ·
27161803 (1) ·
27161886 (1) ·
27161895 (1) ·
27171853 (1) ·
27222475 (1) ·
27240492 (1) ·
27241193 (1) ·
27332870 (1) ·
27332944 (1) ·
27403120 (1) ·
27405750 (1) ·
28004737 (1) ·
28244125 (1) ·
28244169 (1) ·
29060018 (1) ·
29064300 (1) ·
29090099 (1) ·
29090120 (1)
80040535 (1) ·
80041025 (1) ·
80054200 (1) ·
80084275 (1) ·
80103697 (1) ·
80104046 (1) ·
80191739 (1) ·
80192218 (1) ·
80192691 (1) ·
80193090 (1) ·
80220651 (1) ·
80220740 (1) ·
80231981 (1) ·
80232174 (1) ·
80251602 (1) ·
80274550 (1) ·
80274570 (1) ·
80295022 (1) ·
80382659 (1) ·
80491330 (1) ·
80493553 (1) ·
81051410 (1) ·
81051478 (1) ·
81083300 (1) ·
81091401 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.