Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'I 95 to PBIA Ramp ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'Old Dixie Highway ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-472 EB ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR519NB(Fiske Blv)' (1) ·
'SR519SB(Fiske Blv)' (1) ·
'St Lucie West Blvd' (1) ·
'US-1 NB ' (1)
700017 (1) ·
700079 (1) ·
700102 (1) ·
700111 (1) ·
700126 (1) ·
700141 (1) ·
700145 (1) ·
700153 (1) ·
700156 (1) ·
700176 (1) ·
790022 (1) ·
790053 (1) ·
790084 (1) ·
790107 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
940133 (1)
'0.3 mile North of SR 80 ' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'Old Dixie Hwy over I-95 ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-404 WB over CR-3 ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'SR-519 NB I-95 ' (1) ·
'SR-519 SB I-95 ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-528 WB over SR-3 ' (1) ·
'US-1 NB - SR-404 ' (1) ·
I-95 NB and CR-5A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)