Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700210 (1) ·
700211 (1) ·
790147 (1) ·
790148 (1) ·
880005 (1) ·
930361 (1) ·
940003 (1) ·
940004 (1) ·
940084 (1) ·
940085 (1) ·
940158 (1)
'0.23 MI N FPL POWER PLANT' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-A1A - George King Blvd' (1) ·
'SR-A1A over Halifax River' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)