Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'CYPRESS CREEK ' (1) ·
'E-4 CANAL ' (1) ·
'FL. TURNPIKE ' (1) ·
'L-30 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'CONGRESS AVE NB ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'Haverhill Rd ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'LYONS ROAD ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MINER RD. ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
934128 (1) ·
934129 (1) ·
934222 (1) ·
934295 (1) ·
934313 (1) ·
934332 (1) ·
934345 (1) ·
934346 (1) ·
934901 (1) ·
934916 (1) ·
934925 (1) ·
934926 (1) ·
934936 (1) ·
934938 (1) ·
934939 (1) ·
934942 (1) ·
934945 (1) ·
934946 (1) ·
934952 (1) ·
937706 (1)
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'S of Southrn/Haverhll Int' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)