Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6TH AVE SO. EB ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'CR-880 ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'I-95 NB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'LYONS ROAD ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1)
790227 (1) ·
790229 (1) ·
930351 (1) ·
934254 (1) ·
934272 (1) ·
934278 (1) ·
934307 (1) ·
934420 (1) ·
934421 (1) ·
934428 (1) ·
934441 (1) ·
934956 (1) ·
937001 (1) ·
937703 (1) ·
945265 (1)
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.8MI N OF SW BECKER RD ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'I-95 NB over Spruce Creek' (1) ·
'I-95 NB over SR-421 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.