Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6TH AVE SO. EB ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
934254 (1) ·
934278 (1) ·
934307 (1) ·
934420 (1) ·
934421 (1) ·
934428 (1) ·
934441 (1) ·
934468 (1) ·
934469 (1) ·
937001 (1) ·
937703 (1) ·
945265 (1)
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.8MI N OF SW BECKER RD ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.